Working project of power supply of the power unit of the CS.
In the building of the power unit, a complete transformer substation 10/0.4 kV is installed, equipped with two transformers with a capacity of 1000 kVA and cabinets RUNN-0.4 kV with ATS between the sections of RUNN, manufactured by JSC "New Era" in St. Petersburg. One of the cabinets is designed to connect an emergency power source - a diesel power plant AC630-AMS-11P with a capacity of 630 kW. The transformer substation is fed through two mutually redundant cable lines from different sections of RU-10 kV from the block of electrical structures.
If the voltage on the sections of the KTP buses disappears, the power is automatically switched to the diesel power plant. The project provides for compensation of reactive power on the 0.4 kV side with capacitor units with a capacity of 200 kvar, supplied complete with the KTP. To supply consumers on the site of a special group of category I at a voltage of 380/220V 50Hz, a guaranteed power supply system based on G220D400/43.3 inverters by BENNING (Germany) is organized in the power unit.
DC system of the power unit KS:
To supply consumers of the power unit and loads on the site with a voltage of 220V and 24V DC, storage batteries by Sonnenschein are designed in the PEB: 120V in the amount of 108 elements and 24V in the amount of 13 elements, with a capacity of 600A hours each. Storage batteries operate in the constant recharge mode at a voltage not exceeding 2.3 V per element. Forming of the battery and charging after repair are carried out at a voltage of more than 2.3 V per element with the exhaust fan on. If the fan is not turned on, the chargers are automatically switched off. For distribution of electric power at voltage of 380/220V AC, 220V, and 24V DC, power boards are installed in the switchboard - OShSU, ShGP 380/220V, ShPT1 =220V, ShPT =24V, which are manufactured by the Cheboksary Electrical Equipment Plant.

File format: dwg, tif (AutoCAD 2010 is not editable)
Note: the original files of the *.tif format must be in the same folder with the project file *.dwg

Download the file "Project of the ES of the power unit of the CS" >>>

Tags: gas compressor station, power unit

Main features

  • Content type File
  • Content description 1786,05 kB
  • Updated on the site 25.10.2024

Reviews

No reviews yet

0 000 X
There are no such quantities in stock
By clicking the button, you agree to terms for buyers
CS power unit design
2 Sold <10
0 000 X
Secure deal
Instant delivery

You viewed

All images, logos, and names of games, programs, and other products used are taken from public sources and are for informational purposes only. All trademarks, logos, names, and other intellectual property belong to their respective owners. Use of such images on the website does not imply any affiliation or connection with the copyright holders.